Conference Exhibition & Sponsorship Download Brochure

The US Plant Safety Enhancements Conference is now complete.

The conference was a huge success and will return in the fall of 2013. To purchase the post-conference materials please click here


Implement compliant, efficient plant safety modifications following the key regulatory and technical requirements

With 104 reactors in the US the final bill for all post-Fukushima safety upgrades could be $23.5 billion. The US Plant Safety Amendments Conference will help you to develop an unparalleled strategy for plant safety modification projects. This meeting will give you solutions to the most challenging issues in enhancement and modification work, including:

  • Receive the latest regulatory updates regarding the post-Fukushima safety orders enabling you to implement a compliant, viable strategy

  • Gain a clear perspective on the international approach to nuclear plant safety amendments to enhance your project execution using global best practise methods

  • Assess your plans against exclusive case studies from the industry’s leading utilities to further improve your project strategy and implementation

  • Utilise the latest developments in digital modifications, spent fuel pools, hardened vent upgrades and beyond design basis issues to advance your modification work

  • Review your contracting and procurement strategies to ensure your safety enhancement operation is fully and effectively resourced

Download your conference brochure now and receive:

  • Full speaker line up and detailed conference agenda
  • Exclusive content and analysis on post-Fukushima nuclear plant safety upgrades
  • Discounts and registration information

This conference is in high demand. With companies like AREVA, Babcock & Wilcox, URS and Black & Veatch sending 3+ delegates each, spaces are running out fast.

Register NOW to ensure you don't miss out.

Check out just some of our unbeatable line-up of senior-level decision makers for you to network with:

Manager - Major Projects & Uprates AREVA
Senior Vice President, U.S. Plants Sector AREVA NP
Director, Strategic Project Development AREVA NP
Vice President - Nuclear Projects  Babcock & Wilcox
Director - Project Management Organization Babcock & Wilcox Nuclear Energy
Association Vice President - Director Nuclear Construction & Procurement Black & Veatch
Director Black & Veatch
Manager, Industry Interface DTE Energy
Special Projects Coordinator - Fukushima Response Program Duke Energy
Vice President Operations/Executive Director Entergy/NEI
Operations Support Manager Exelon
Head - Technology Development IAEA
Deputy Director Japan Lessons-Learned Project Directorate Office of Nuclear Reactor Regulation US NRC
Safety Systems Segment Manager Rolls-Royce
President Shaw Global Services
Manager - Nuclear Licensing URS
Managing Director WANO
Integrated Program Manager, Post - Fukushima Products and Services Westinghouse

"Very informative on status, risks and challenges of... nuclear industry." Joseph Fazio, Project Engineer - New Nuclear ProjectsFPL


KEY FEATURES AND ANALYSIS FOR 2012

An efficient and comprehensive plan is crucial for the successful implementation of the post-Fukushima compulsory plant safety enhancements and modifications at nuclear facilities.

By implementing a detailed and well managed programme, it will help in overcoming the key challenges of funding constraints, skilled personnel, risk reduction, and compliance with regulations. 

This year, you will receive exclusive insight into:

  • International action plans to strengthen nuclear safety, emergency preparedness and radiation protection

  • Exclusive Case Study from Brazil’s Eletronuclear Angra Nuclear Power Station Safety Reevaluation
  • Solutions to maintaining safety after a catastrophic event so you can utilize emergency equipment

  • Use of hardened vents in Mark 1 & 2 containers and spent fuel pool instrumentation
  • Assessment of Emergency Preparedness and Severe Accident Management plans
  • Re-evaluating Seismic & Flooding Hazards, Risk Assessments and the Walk-downs for Seismic and Flooding Compliance

  • Containment protection strategies and filtered containment venting systems technology being adopted today internationally
  • Exclusive analysis into the worldwide nuclear industry impact of the Fukushima accident

"A must-do conference for those interested in learning about this" Duane Olcsvary, Director of Supply ChainTVA


ORGANIZATIONS THAT HAVE ATTENDED OUR OTHER NUCLEAR SHOWS

This conference will be a crucial platform for the industry to understand the critical enablers and share information on best practice. Combining expertise across the US and internationally, the US Plant Safety Enhancement Conference will encompass the technical and business critical factors influencing nuclear safety upgrades.

Take at look at some of the top organizations that have attended our previous nuclear industry events:

Governing & Trade Bodies   Nuclear Owners   Nuclear Contractors
  • American Nuclear Society
  • Carolina Nuclear Cluster
  • City of Columbia
  • EPRI
  • IAEA
  • National Energy Board
  • NNSA
  • Nuclear Energy Institute
  • NuHub
  • U.S. Congress
  • U.S. DOE
  • U.S. Dept. of Commerce
  • U.S. NRC
 
  • Blue Castle Holdings
  • Bruce Power
  • CENG
  • Dairyland Power
  • Dominion
  • DTE Energy
  • Duke Energy
  • ENEC
  • Eskom
  • Florida Power & Light
  • MOX Facility 
  • OPG
  • Progress Energy
  • PSEG
  • Southern Company
  • SRNL
  • SCANA
  • TVA
  • UniStar
  • URENCO
 
  • AECL
  • Aecon
  • Alstom
  • AMEC
  • AREVA NP
  • B&W
  • Bechtel Power
  • Black & Veatch
  • CH2M Hill
  • Day & Zimmermann 
  • Fluor Nuclear Power
  • GE Hitachi
  • CANDU Industries
  • Shaw Power Group
  • Siemens
  • Toshiba Nuclear Energy
  • URS
  • Westinghouse
  • WorleyParsons
  • Zachry Nuclear

Download the brochure now to find out more about this brand new nuclear safety upgrade and modification event for the US and international nuclear energy industry.


WHY THIS CONFERENCE IS SO CRITICAL

The US nuclear industry has been making great strides to work together and ensure that all post-Fukushima safety evaluations and enhancements are compliant and executed timely and effectively.

Implementing a detailed and well managed program will help in overcoming the key challenges of technical issues, skilled personnel, emergency preparedness, risk reduction, and compliance with regulations. 

Behind the key challenges of technical issues, skilled personnel, emergency preparedness, risk reduction, and compliance with regulations is the financial question: How much will it cost?

There are international examples from which we can make an educated guess on cost implications behind installation, implementation and engineering procedures:

France: Following orders to carry out extra safety measures to guard against “extreme” situations after the Fukushima nuclear disaster, EDF has estimated that the safety upgrade work at each of its 58 reactors will cost about €10 billion ($13.3 billion) and take until 2018.

South Africa: Eskom spent $250 million on safety upgrades and improving spent fuel pool instrumentation at the Koeberg Nuclear Power Station

Brazil: Eletronuclear is looking to spend $200 million on stress tests and modification work at the Angra Nuclear Power Station.

The conference will provide in-depth analysis into cost estimation as well as:

  • The latest regulatory updates regarding the post-Fukushima safety orders
  • International approaches to nuclear plant safety amendments
  • Case studies from the industry’s leading utilities
  • The latest developments in digital modifications, spent fuel pools, hardened vent upgrades and beyond design basis issues
  • Contracting and procurement strategies to ensure safety enhancement operations are fully and effectively resourced

This conference will bring together over 150 senior decision makers and experts from across the globe working in nuclear emergency planning, safety, engineering, and operations for two days of business critical intelligence, unrivalled networking and stimulating discussion.

To find out more about this premier nuclear safety upgrade and modification event, download the brochure now

Jack Shillito

Senior Industry Analyst
Nuclear Energy Insider


Email: jshillito@nuclearenergyinsider.com
Phone: +44 (0) 207 375 7598

 
Post Event Materials Click Here
The Event
2012 Brochure
Detailed Event Information
Direct to Your Inbox
Click Here
KEYNOTE PRESENTATION
Thomas KoshyThomas Koshy
Section Head - Nuclear Power Technology Development Section
IAEA
Utility Speakers From

Exelon

Duke Energy

Entergy

DTE Energy

Eskom

Eletrobras

Expert Speakers From

Areva

Westinghouse

Babcock & Wilcox

Premium Media Partner

Nuclear Energy Link

Bronze Sponsor

Scientech

Exhibitors

merrick

Fairbanks Morse Engine

KEYNOTE PRESENTATIONS FROM
IAEA
REGULATORY UPDATE FROM
US NUCLEAR REGULATORY COMMISSION
OWNER PERSPECTIVES FROM
Entergy Exelon Nuclear Duke Energy DTE Energy
  Eskom Eletrobras  
EXPERT PERSPECTIVES FROM
Areva Babcock & Wilcox Westinghouse Shaw
Enercon URS Ux Consulting WANO
Black & Veatch
INDUSTRY PARTNERS
  Carolinas Nuclear Cluster Linton Consulting  
PREMIUM MEDIA PARTNER
Nuclear Energy Link
BRONZE SPONSOR
Scientech
EXHIBITORS
  merrick Fairbanks Morse Engine  
MEDIA PARTNERS
Your Nuclear News NucNet Careers in Nuclear Nuclear Power International
Cool Hand Nuke MarketsandMarkets Ux Consulting